


Steps to Open Up
1: OPEN gate valve on Concrete Tank (red handle)
2: Turn ON power switch to household water pump

Steps to Open Up
3: Turn ON power fuses for:
– Sub Board E (hot water)
– Sub Board W (stove)
– Protected Light
– A/C 09 (bedroom)
– A/C 34 (optional – living area)
4:



Steps to Close Down
1: Turn OFF power fuses for:
– Sub Board E (hot water)
– Sub Board W (stove)
– Protected Light
– A/C 09 (bedroom)
– A/C 34
– keep Septic (fuse ON) operational : aerobic
2: Turn OFF power switch to household water pump
3: Shut OFF gate valve to Concrete Tank (red handle)
4:
